ISO 7170 標準家具--儲物單元--強度和耐久性要求測試
| 更新時間 2025-01-10 20:00:00 價格 請來電詢價 測試周期 5-7天 寄樣地址 深圳寶安 價格費用 電話詳談 聯系電話 17324413130 聯系手機 17324413130 聯系人 羅卓文 立即詢價 |
Test item 測試名稱:
Furniture-Storage units-Determination of strength and durability
家具--儲物單元--強度和耐久性要求
Test info 測試內容:
| Test Requirement |
| |
6 | Test procedures for non-movable parts 針對固定部件 |
| |
6.1.1 | General 一般要求 |
| |
6.1.2 | Shelf retention test 架子保持測試 |
| |
6.1.3 | Deflection of shelves 架子變形量測試 |
| |
6.1.4 | Strength of shelf supports 架子支撐強度 |
| |
6.2.1 | Sustained test for tops and bottoms 頂部和底部耐荷重測試 |
| |
6.2.2 | Static load test for tops and bottoms 頂部和底部靜載測試 |
| |
6.3.1 | Strength of clothes-rail and their supports 掛衣桿強度測試 |
| |
6.3.2 | Dislodgement of clothes rails 掛衣桿分離測試 |
| |
6.4.1 | Test for structure and underframe 結構測試 |
| |
6.4.2 | Drop test 跌落測試 |
| |
6.4.3 | Tests for units with castors or wheels 帶輪子儲物單元測試 |
| |
7 | Test procedures for movable parts 針對移動部件測試 |
| |
7.1 | Pivoted doors 軸心門 |
| |
7.1.1 | General 一般要求 |
| |
7.1.2.1 | Vertical load on pivoted doors 軸心門垂直靜載測試 |
| |
7.1.2.2 | Horizontal load on pivoted doors 軸心門水平測試 |
| |
7.1.3 | Slam-shut test of pivoted doors 軸心門關閉測試 |
| |
7.1.4 | Durability of pivoted doors 軸心門耐久性測試 |
| |
7.2 | Sliding doors and horizontal roll-fronts 滑動門和滾動門 |
| |
7.2.1 | General 一般要求 |
| |
7.2.2 | Slam shut/open test of sliding doors and horizontal roll-fronts 滑動門和滾動門關閉測試 | ||
7.2.3 | Durability of sliding doors and horizontal roll-fronts 滑動門和滾動門耐久性測試 | ||
7.3 | Flaps 側翼 |
| |
7.3.1 | Strength of bottom-hinged flaps 底部鉸鏈側翼的強度 |
| |
7.3.2 | Durability of flaps 側翼耐久性測試 |
| |
7.3.3 | Drop test for top-hinged flaps 頂部鉸鏈側翼的跌落測試 |
| |
7.4 | Vertical roll-fronts 垂直滾動門 |
| |
7.4.1 | Slam shut/open of vertical roll-fronts 垂直滾動門關閉測試 |
| |
7.4.2 | Durability of vertical roll-fronts 垂直滾動門耐久性測試 |
| |
7.5 | Extension elements 伸出部件 |
| |
7.5.1 | General 一般要求 |
| |
7.5.2 | Strength of extension elements 伸出部件強度 |
| |
7.5.3 | Durability of extension elements 伸出部件耐久性測試 |
| |
7.5.4 | Slam shut/open test of extension elements 伸出部件關閉測試 |
| |
7.5.5 | Displacement of extension element bottoms 伸出部件底部分離測試 | ||
7.5.6 | Interlock test 互鎖 |
| |
7.6 | Locking and latching mechanism tests 鎖的機械測試 |
| |
7.6.1 | General 一般要求 |
| |
7.6.2 | Strength test for locking and latching mechanisms for extension elements 伸出部件上鎖定裝置強度測試 | ||
7.6.3 | Locking and latching mechanisms for doors, flaps and roll-fronts 門、側翼、滾動門上鎖定裝置強度測試 | ||
7.6.4 | Durability test of locking and latching mechanisms 鎖定裝置的耐久性測試 | ||
8 | Units mounted to the building or other structure 安裝在建筑或其他結構上的單元 | ||
8.1.1 | General 一般要求 |
| |
8.1.2 | Movable parts, shelf supports, tops and bottoms 移動部件、架子支撐、頂部和 底部測試 |
| |
8.1.3 | Sustained load test(overload) 耐荷重測試 |
| |
8.1.4 | Dislodgement test 分離測試 |
| |
8.2 | Units supported by the floor 地板支撐單元 |
| |
| |||
樣品要求: 全套樣品5套并包括安裝說明書(如適用). | |||
| |||
所需時間: 針對等級1和2,標準(11個工作天), 加快(9 個工作天);針對等級3,13個工作天,針對更高等級,18個工作天 |
Photo for reference 參考圖片:
Sample Report 報告樣本:
聯系方式
- 電 話:17324413130
- 檢測工程師:羅卓文
- 手 機:17324413130